top of page
PHR PRRP Project
OPERATOR
Pertamina Hulu Energi (ONWJ)
EPCI
LOCATION
Java Sea
EPCI CONTRACTOR
PT. TIMAS Suplindo
AEM SOW
Detail Design Engineering:
- Detail design for replacement of pipelines, flowline, risers and retrofit clamps.
- Procurement support (RFQ’s, TBE’s).
FACILITIES
- 14” infield rigid pipeline from PCP to MMF
platform (approx. 30 km)
- 10” infield rigid pipeline from BG to BC
platform (approx. 10 km)
- 14” and 10 ” rigid spools
- 14” and 10” rigid risers, retro fit clamps and
flanges
- 14” and 10” breakout spools
- 6” x 3km infield flexible flowline
![](https://static.wixstatic.com/media/a9d0e3_0639052d336946e6a85da68ef93c84e1~mv2.jpg/v1/fill/w_980,h_655,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/a9d0e3_0639052d336946e6a85da68ef93c84e1~mv2.jpg)
![](https://static.wixstatic.com/media/a9d0e3_8d7b14af29794a168df4e6428cf5f2a1~mv2.jpg/v1/fill/w_980,h_658,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/a9d0e3_8d7b14af29794a168df4e6428cf5f2a1~mv2.jpg)
1/1
bottom of page